Manufacturing & industrial
IBM Maximo reporting: ask about work orders, PM compliance and asset downtime
IBM Maximo is an enterprise asset management (EAM) system, now delivered as Maximo Application Suite. Maintenance and reliability teams in utilities, manufacturing, transportation, oil and gas and facilities use it to register assets and locations, plan preventive maintenance, raise and execute work orders, record failures and labor, and manage spare parts inventory.
IBM Maximo
Available now: Nexatron answers IBM Maximo questions with user-level access that inherits your existing IBM Maximo permissions.
Updated
Can Claude, ChatGPT or Copilot access IBM Maximo data?
Yes. To connect Claude, ChatGPT or Copilot to IBM Maximo, add Nexatron from Claude’s connector directory, or by its MCP server URL in ChatGPT and Copilot. Then connect it in Nexatron. Users sign in with their own IBM Maximo account (or your SSO), and Nexatron inherits their existing permissions.
What IBM Maximo data a question reads
- Work orders (WORKORDER)
- Corrective, preventive and emergency work with work type, status, priority, asset, location, site, reported and actual finish dates, and estimated versus actual labor and materials.
- Assets (ASSET)
- Equipment records with asset number, hierarchy, location, classification, status, criticality, meters and cost history.
- Locations (LOCATIONS)
- Operating, storeroom and repair locations in hierarchies that assets sit within.
- Preventive maintenance (PM)
- PM records with frequency, job plan, next due date and the work orders they generate.
- Failure reporting
- Failure class, problem, cause and remedy codes recorded on work orders.
- Inventory and items
- Spare parts by storeroom with balance, reorder point, issues to work orders and unit cost.
IBM Maximo questions people ask
- What is our PM compliance by site this quarter, counting PMs completed within 10% of their due date?
- How many corrective work orders are open on critical assets, and how old is the backlog?
- Which pump assets had the shortest mean time between failures in the last 12 months?
- What were the top five failure causes on conveyors at the Toledo plant this year?
- How did estimated labor hours compare with actual hours by craft last month?
- Which storeroom items have been issued to work orders more than twice their usual monthly rate?
Who asks IBM Maximo questions
- Maintenance planners and supervisors
- Backlog by craft and priority, PM compliance and work orders waiting on materials.
- Reliability engineers
- Failure codes, MTBF and repeat failures on critical assets.
- Plant and asset managers
- Maintenance cost per asset, planned versus reactive work and downtime by site.
How Nexatron connects to IBM Maximo
- API and sign-in
- The Maximo REST API (the JSON API over object structures such as MXAPIWODETAIL and MXAPIASSET, formerly called OSLC). In Maximo Application Suite it authenticates with API keys created for a Maximo user, or with that user’s credentials through the configured identity provider.
- User-level access
- Users sign in with their own IBM Maximo account (or your SSO), and Nexatron inherits their existing permissions. Users only see data they are already authorized to see.
- Read-only
- Questions only read IBM Maximo; asking a question never changes IBM Maximo data.
- Setup
- An administrator enables IBM Maximo in Nexatron. Users link their own IBM Maximo account, or sign in through your SSO, the first time they ask. Queries run in IBM Maximo, with no warehouse to load.
IBM Maximo in Claude’s connector directory
Nexatron is listed in Claude’s MCP connector directory, so a Claude user can add it without a custom server URL. Its hosted MCP server answers IBM Maximo questions for Claude, ChatGPT and Microsoft Copilot with user-level access, and the same governed answer as the Nexatron app. It is Nexatron’s own server, not one published by the vendor.
- Connect IBM Maximo to your Nexatron workspace.
- In Claude, add Nexatron from Claude’s connector directory. In ChatGPT or Copilot, add a custom MCP connector with Nexatron’s server URL.
- Sign in with your own Nexatron identity (OAuth 2.1), then ask your IBM Maximo questions.
Server URL for a custom connector: https://api.nexatron.io/api/v1/mcp
IBM Maximo questions and answers
- How do I create reports in IBM Maximo?
- Maximo ships with BIRT reports, ad hoc reports built from list views, and KPI and result set portlets on start centers. In Maximo Application Suite, Maximo Health and Manage dashboards add views on asset condition. Nexatron adds questions in everyday language on top of the same records.
- Does Maximo have a REST API for work orders?
- Yes. The Maximo REST API, built on object structures, exposes work orders, assets, locations, PMs, inventory and more as JSON with filtering, selected fields and paging. Object structures such as MXAPIWODETAIL are the standard way to read work order data.
- How is PM compliance measured in Maximo?
- A common definition counts PM work orders completed within a tolerance window around the target start date, divided by all PM work orders due in the period. Sites differ in the window and whether canceled PMs count, so Nexatron shows the definition beside the figure.
Try Nexatron with your IBM Maximo
Tell us the IBM Maximo questions you want answered and who asks them, and we plan the demo around them. Do not include credentials or confidential records.
IBM Maximo is a trademark of its owner.